|
Flooring Information - Before you buy
Measurement -
Carefully measure each room or area to determine the
necessary quantity. Particular attention should be paid to
doors, closets, unusual angles.
Installation Date
- Double check the delivery date, the installation date and
the estimated time allowance for the installation since your
home will be in disarray during installation.
Furniture Moving
- Discuss furniture moving with your retailer. The installer
may move furniture, but there may be an extra charge.
Starting Points & Seams
- Prior to installation discuss with your flooring
professional starting (focal) points and/or where seams will
be placed.
Existing Flooring
- Discuss removal of existing carpet with your retailer. The
following steps are recommended: ventilation during removal;
and vacuuming the floor after the old flooring has been
removed.
Disposal of Old Flooring
– Often the disposal of old flooring must follow specific
care or formats. In most cases you can arrange with your
retailer to have them dispose of your old flooring (there
will most likely be an additional charge).
Inspection -
Prior to installation, inspect the flooring to see that it
meets your order’s specifications of colour, size, texture
and style, and that it is free from defects.
Excess Flooring
- Discuss with your dealer whether you would like to keep
any left-over flooring for future use or to keep in case
repairs are necessary in the future. “Normal” waste factors
vary by flooring type, but generally are approximate 5-10%
of the total order.

|
carpet
|
area rugs
|
hardwood
|
laminate
|
cork |
ceramic tile
|
|
natural stone
|
vinyl flooring
|
linoleum
|
installer apprenticeship
|
careers in flooring
|
 |